Two plants, one specification

Blending runs under a fully automatic control system, so the recipe is held by the controller rather than set by hand. Filling covers 4 L, 18 L and 200 L formats, and every unit carries a batch and date code before it leaves the line.

Plant exterior
Plant exterior
Yantai plant · Zhifu District
Base oil tank farm
Base oil tank farm
Tank farm · 10 × 700 m³
Blending hall
Blending hall
Blending hall · 15 t – 60 t
Filling hall
Filling hall
Filling hall · 7 lines
Finished goods warehouse
Finished goods warehouse
Finished goods · coded
Laboratory
Laboratory
Laboratory · release testing

Main production equipment

Complete equipment schedule for the Yantai site, as recorded in the company profile.

Blending

Equipment / modelEquipmentQty
Full automation Automatic blending control system 1 set
60 t Blending kettle 1
45 t Blending kettle 2
30 t Blending kettle 1
15 t Blending kettle 2

Filling

Equipment / modelEquipmentQty
4LZH-4LB-6 4L filling machine 2
4LZH-4LB-2 4L filling machine 2
18LZH-20LQ-6 18L filling machine 2
18LZH-20LQ-2 18L filling machine 1
200LZH-200LB-6 200L filling machine 1

Storage

Equipment / modelEquipmentQty
15 t Blending ground tank 3
700 m³ Storage tank 10
60 m³ Semi-finished product tank 43

Site services

Equipment / modelEquipmentQty
7320 Inkjet coder 8
S11-200 / S11-250 Transformer 2

Every drum carries its own history

Eight inkjet coders apply batch and date marks on the filling lines. A batch number links the finished pack back to the blending record, the base stock and the additive package used in that run. Request the batch record with any order.

01

Base stock intake

Incoming base oil and additives recorded against the batch before blending starts.

02

Blending record

Kettle, batch size, recipe and operating parameters logged by the control system.

03

In-process check

Viscosity and appearance verified before the batch is released to filling.

04

Filling and coding

Batch and date code applied to every unit; count reconciled against the production order.

05

Release testing

Finished product tested against the agreed parameters; certificate of analysis issued.

06

Sample archive

A retained sample of every batch is stored so a future order can be matched to it.

Planning a plant visit or an audit?

We can arrange a visit to the Yantai site, or supply the documentation your quality team needs before placing a first order.